As a result of an investigation of the old system by the inspection authorities, the existing sprinklers had to be replaced by new ones. The work included the delivery and installation of the sprinklers including all ancillary services such as commissioning and decommissioning as well as all system components including the final documentation.
HL-Technik in Munich was commissioned by the client of the two high-rise buildings in Berlin to plan and tender for the technical building equipment such as heating, ventilation, sanitary, electrical engineering and fire extinguishing systems and to supervise and handle the installation. B+H was awarded the partial contract for planning, calculating and drawing up the specifications for the high-pressure water mist extinguishing systems and for the pressure boosting systems for the internal hydrants.
As a wood-processing company with a sawmill, Abalon Hardwood Hessen GmbH in Schwalmstadt (Hesse) is subject to a high usage risk and a special classification by property insurers. To ensure that Abalon will not have any difficulties in finding an acceptable property insurer in the future, the management decided to fit a sprinkler system in the sawmill and the sorting hall. For this, all engineering-related matters such as coordination with the authorities and experts, existing situation assessment, CAD services, hydraulic pipe network calculations, cost calculations etc. had to be carried out in order to produce an acceptable planning and a tender in line with market standards for the building owner.
Gebr. Müller Holzbearbeitung GmbH in Essen is a wood processing company specialising in the industrial production of wooden windows. The local authorities have instructed Gebr. Müller to install a sprinkler system in the plant. For this, all engineering-related procedures such as coordination with the authorities and experts, existing situation assessment, CAD services, hydraulic pipe network calculations, cost calculations etc. had to be carried out in order to produce an acceptable planning and a tender in line with market standards for the building owner. It is also very significant that Gebr. Müller intends to commission B+H with the installation of the sprinkler system, provided the offer is competitive.
Kraftanlagen Hamburg GmbH required the prefabricated welded pipes for the hall areas that were to be protected. B+H manufactured the pipes in accordance with Kraftanlagen’s technical and dimensional specifications, furnished them with corrosion protection and delivered the goods directly to the construction site, including the preparation of the necessary shipping papers and documentation.
The Pirelli plant in Breuberg has undergone major changes in recent years and is subject to constant restructuring processes. As part of the construction of new production facilities, the existing control centre has to make way for the fire extinguishing pumps and is being reinstalled at another location. In doing so, the group guidelines of Milan-based Pirelli as well as the specifications of the American property insurer must be observed. All technical engineering matters such as coordination with the authorities and experts, existing situation assessment, CAD services, hydraulic pipe network calculations, cost calculations, etc. were necessary in order to produce an acceptable planning and a tender in line with market standards for the building owner.
The steelworks in Dillenburg is an existing building which has changed a great deal over the last 20 years.
The local authorities have instructed OTK to install a sprinkler system in the plant. For this, all engineering-related services such as coordination with the authorities and experts, existing situation assessment, CAD services, hydraulic pipe network calculations, cost calculations etc. had to be carried out in order to produce an acceptable planning and a tender in line with market standards.
As a result of an investigation of the old system by the inspection authorities, the existing sprinklers had to be replaced by new ones. The work included the delivery and installation of the sprinklers including all ancillary services such as commissioning and decommissioning as well as all system components including the final documentation.
Kraftanlagen Hamburg GmbH required the prefabricated welded pipes for the hall areas that were to be protected. B+H manufactured the pipes in accordance with Kraftanlagen’s technical and dimensional specifications, furnished them with corrosion protection and delivered the goods directly to the construction site, including the preparation of the necessary shipping papers and documentation.
HL-Technik in Munich was commissioned by the client of the two high-rise buildings in Berlin to plan and tender for the technical building equipment such as heating, ventilation, sanitary, electrical engineering and fire extinguishing systems and to supervise and handle the installation. B+H was awarded the partial contract for planning, calculating and drawing up the specifications for the high-pressure water mist extinguishing systems and for the pressure boosting systems for the internal hydrants.
The Pirelli plant in Breuberg has undergone major changes in recent years and is subject to constant restructuring processes. As part of the construction of new production facilities, the existing control centre has to make way for the fire extinguishing pumps and is being reinstalled at another location. In doing so, the group guidelines of Milan-based Pirelli as well as the specifications of the American property insurer must be observed. All technical engineering matters such as coordination with the authorities and experts, existing situation assessment, CAD services, hydraulic pipe network calculations, cost calculations, etc. were necessary in order to produce an acceptable planning and a tender in line with market standards for the building owner.
As a wood-processing company with a sawmill, Abalon Hardwood Hessen GmbH in Schwalmstadt (Hesse) is subject to a high usage risk and a special classification by property insurers. To ensure that Abalon will not have any difficulties in finding an acceptable property insurer in the future, the management decided to fit a sprinkler system in the sawmill and the sorting hall. For this, all engineering-related matters such as coordination with the authorities and experts, existing situation assessment, CAD services, hydraulic pipe network calculations, cost calculations etc. had to be carried out in order to produce an acceptable planning and a tender in line with market standards for the building owner.
The steelworks in Dillenburg is an existing building which has changed a great deal over the last 20 years.
The local authorities have instructed OTK to install a sprinkler system in the plant. For this, all engineering-related services such as coordination with the authorities and experts, existing situation assessment, CAD services, hydraulic pipe network calculations, cost calculations etc. had to be carried out in order to produce an acceptable planning and a tender in line with market standards.
Gebr. Müller Holzbearbeitung GmbH in Essen is a wood processing company specialising in the industrial production of wooden windows. The local authorities have instructed Gebr. Müller to install a sprinkler system in the plant. For this, all engineering-related procedures such as coordination with the authorities and experts, existing situation assessment, CAD services, hydraulic pipe network calculations, cost calculations etc. had to be carried out in order to produce an acceptable planning and a tender in line with market standards for the building owner. It is also very significant that Gebr. Müller intends to commission B+H with the installation of the sprinkler system, provided the offer is competitive.